{"id":3431,"date":"2026-07-31T18:01:31","date_gmt":"2026-07-31T15:01:31","guid":{"rendered":"https:\/\/highpressuregroup.com\/projects\/%ce%bc%ce%b5%ce%bb%ce%ad%cf%84%ce%b7-%ce%ba%ce%b1%cf%84%ce%b1%cf%83%ce%ba%ce%b5%cf%85%ce%ae-%cf%86%ce%bf%cf%81%ce%b7%cf%84%ce%ae%cf%82-%cf%85%ce%b4%cf%81%ce%b1%cf%85%ce%bb%ce%b9%ce%ba%ce%ae%cf%82\/"},"modified":"2026-08-07T15:56:10","modified_gmt":"2026-08-07T12:56:10","slug":"meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon","status":"publish","type":"projects","link":"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/","title":{"rendered":"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit"},"content":{"rendered":"<div>\n<p>    Design and construction of a high-performance portable hydraulic unit for pile installation and driving applications. The unit was developed according to the project\u2019s requirements, combining a petrol engine, a high-pressure hydraulic circuit, a control system and a robust wheeled frame to ensure reliable operation under demanding field conditions.\n<\/p><\/div>\n<h3>Project Description<\/h3>\n<div>This portable hydraulic unit is a fully integrated system, designed and manufactured entirely according to the application requirements for pile installation and driving operations. From engineering the hydraulic circuit and sizing the individual components to fabricating the frame, assembling the unit and conducting the final operational tests, every stage was completed with the aim of ensuring maximum reliability, high performance and safe operation under demanding working conditions.<\/p>\n<p>The unit combines a petrol-powered drive system, a high-pressure hydraulic power unit, a control circuit and a robust wheeled frame in one complete solution designed for maximum performance and reliability.<\/p>\n<p>Every component was designed with the equipment\u2019s overall functionality in mind, from the ergonomic arrangement of its components to easy access for inspection and maintenance. The robust engineering construction and meticulous assembly reflect High Pressure Group\u2019s philosophy of developing specialised hydraulic solutions tailored to the actual requirements of each application.<\/p><\/div>\n<ul>\n<li>\n<h3>Location<\/h3>\n<div>\n<p>Greece (EU)<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>Year<\/h3>\n<div>\n<p>2026<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>Service<\/h3>\n<div>Engineering &#038; Construction of a Portable Hydraulic Pile-Installation Unit<\/div>\n<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/%CE%9C%CE%B5%CE%BB%CE%AD%CF%84%CE%B7-%CE%9A%CE%B1%CF%84%CE%B1%CF%83%CE%BA%CE%B5%CF%85%CE%AE-%CE%A6%CE%BF%CF%81%CE%B7%CF%84%CE%AE%CF%82-%CE%A5%CE%B4%CF%81%CE%B1%CF%85%CE%BB%CE%B9%CE%BA%CE%AE%CF%82-%CE%9C%CE%BF%CE%BD%CE%AC%CE%B4%CE%B1%CF%82-%CE%A4%CE%BF%CF%80%CE%BF%CE%B8%CE%AD%CF%84%CE%B7%CF%83%CE%B7%CF%82-%CE%A0%CE%B1%CF%83%CF%83%CE%AC%CE%BB%CF%89%CE%BD-2.webp\" alt=\"\"><br \/>\n<img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/%CE%9C%CE%B5%CE%BB%CE%AD%CF%84%CE%B7-%CE%9A%CE%B1%CF%84%CE%B1%CF%83%CE%BA%CE%B5%CF%85%CE%AE-%CE%A6%CE%BF%CF%81%CE%B7%CF%84%CE%AE%CF%82-%CE%A5%CE%B4%CF%81%CE%B1%CF%85%CE%BB%CE%B9%CE%BA%CE%AE%CF%82-%CE%9C%CE%BF%CE%BD%CE%AC%CE%B4%CE%B1%CF%82-%CE%A4%CE%BF%CF%80%CE%BF%CE%B8%CE%AD%CF%84%CE%B7%CF%83%CE%B7%CF%82-%CE%A0%CE%B1%CF%83%CF%83%CE%AC%CE%BB%CF%89%CE%BD-1.webp\" alt=\"\"><\/p>\n<h2>Gallery<\/h2>\n<ul>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/%CE%9C%CE%B5%CE%BB%CE%AD%CF%84%CE%B7-%CE%9A%CE%B1%CF%84%CE%B1%CF%83%CE%BA%CE%B5%CF%85%CE%AE-%CE%A6%CE%BF%CF%81%CE%B7%CF%84%CE%AE%CF%82-%CE%A5%CE%B4%CF%81%CE%B1%CF%85%CE%BB%CE%B9%CE%BA%CE%AE%CF%82-%CE%9C%CE%BF%CE%BD%CE%AC%CE%B4%CE%B1%CF%82-%CE%A4%CE%BF%CF%80%CE%BF%CE%B8%CE%AD%CF%84%CE%B7%CF%83%CE%B7%CF%82-%CE%A0%CE%B1%CF%83%CF%83%CE%AC%CE%BB%CF%89%CE%BD-8.webp\" alt=\"\"><\/p>\n<h3>Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (8)<\/h3>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/%CE%9C%CE%B5%CE%BB%CE%AD%CF%84%CE%B7-%CE%9A%CE%B1%CF%84%CE%B1%CF%83%CE%BA%CE%B5%CF%85%CE%AE-%CE%A6%CE%BF%CF%81%CE%B7%CF%84%CE%AE%CF%82-%CE%A5%CE%B4%CF%81%CE%B1%CF%85%CE%BB%CE%B9%CE%BA%CE%AE%CF%82-%CE%9C%CE%BF%CE%BD%CE%AC%CE%B4%CE%B1%CF%82-%CE%A4%CE%BF%CF%80%CE%BF%CE%B8%CE%AD%CF%84%CE%B7%CF%83%CE%B7%CF%82-%CE%A0%CE%B1%CF%83%CF%83%CE%AC%CE%BB%CF%89%CE%BD-7.webp\" alt=\"\"><\/p>\n<h3>Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (7)<\/h3>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/%CE%9C%CE%B5%CE%BB%CE%AD%CF%84%CE%B7-%CE%9A%CE%B1%CF%84%CE%B1%CF%83%CE%BA%CE%B5%CF%85%CE%AE-%CE%A6%CE%BF%CF%81%CE%B7%CF%84%CE%AE%CF%82-%CE%A5%CE%B4%CF%81%CE%B1%CF%85%CE%BB%CE%B9%CE%BA%CE%AE%CF%82-%CE%9C%CE%BF%CE%BD%CE%AC%CE%B4%CE%B1%CF%82-%CE%A4%CE%BF%CF%80%CE%BF%CE%B8%CE%AD%CF%84%CE%B7%CF%83%CE%B7%CF%82-%CE%A0%CE%B1%CF%83%CF%83%CE%AC%CE%BB%CF%89%CE%BD-6.webp\" alt=\"\"><\/p>\n<h3>Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (6)<\/h3>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/%CE%9C%CE%B5%CE%BB%CE%AD%CF%84%CE%B7-%CE%9A%CE%B1%CF%84%CE%B1%CF%83%CE%BA%CE%B5%CF%85%CE%AE-%CE%A6%CE%BF%CF%81%CE%B7%CF%84%CE%AE%CF%82-%CE%A5%CE%B4%CF%81%CE%B1%CF%85%CE%BB%CE%B9%CE%BA%CE%AE%CF%82-%CE%9C%CE%BF%CE%BD%CE%AC%CE%B4%CE%B1%CF%82-%CE%A4%CE%BF%CF%80%CE%BF%CE%B8%CE%AD%CF%84%CE%B7%CF%83%CE%B7%CF%82-%CE%A0%CE%B1%CF%83%CF%83%CE%AC%CE%BB%CF%89%CE%BD-5.webp\" alt=\"\"><\/p>\n<h3>Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (5)<\/h3>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/%CE%9C%CE%B5%CE%BB%CE%AD%CF%84%CE%B7-%CE%9A%CE%B1%CF%84%CE%B1%CF%83%CE%BA%CE%B5%CF%85%CE%AE-%CE%A6%CE%BF%CF%81%CE%B7%CF%84%CE%AE%CF%82-%CE%A5%CE%B4%CF%81%CE%B1%CF%85%CE%BB%CE%B9%CE%BA%CE%AE%CF%82-%CE%9C%CE%BF%CE%BD%CE%AC%CE%B4%CE%B1%CF%82-%CE%A4%CE%BF%CF%80%CE%BF%CE%B8%CE%AD%CF%84%CE%B7%CF%83%CE%B7%CF%82-%CE%A0%CE%B1%CF%83%CF%83%CE%AC%CE%BB%CF%89%CE%BD-4.webp\" alt=\"\"><\/p>\n<h3>Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (4)<\/h3>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/%CE%9C%CE%B5%CE%BB%CE%AD%CF%84%CE%B7-%CE%9A%CE%B1%CF%84%CE%B1%CF%83%CE%BA%CE%B5%CF%85%CE%AE-%CE%A6%CE%BF%CF%81%CE%B7%CF%84%CE%AE%CF%82-%CE%A5%CE%B4%CF%81%CE%B1%CF%85%CE%BB%CE%B9%CE%BA%CE%AE%CF%82-%CE%9C%CE%BF%CE%BD%CE%AC%CE%B4%CE%B1%CF%82-%CE%A4%CE%BF%CF%80%CE%BF%CE%B8%CE%AD%CF%84%CE%B7%CF%83%CE%B7%CF%82-%CE%A0%CE%B1%CF%83%CF%83%CE%AC%CE%BB%CF%89%CE%BD-3.webp\" alt=\"\"><\/p>\n<h3>Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (3)<\/h3>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/%CE%9C%CE%B5%CE%BB%CE%AD%CF%84%CE%B7-%CE%9A%CE%B1%CF%84%CE%B1%CF%83%CE%BA%CE%B5%CF%85%CE%AE-%CE%A6%CE%BF%CF%81%CE%B7%CF%84%CE%AE%CF%82-%CE%A5%CE%B4%CF%81%CE%B1%CF%85%CE%BB%CE%B9%CE%BA%CE%AE%CF%82-%CE%9C%CE%BF%CE%BD%CE%AC%CE%B4%CE%B1%CF%82-%CE%A4%CE%BF%CF%80%CE%BF%CE%B8%CE%AD%CF%84%CE%B7%CF%83%CE%B7%CF%82-%CE%A0%CE%B1%CF%83%CF%83%CE%AC%CE%BB%CF%89%CE%BD-2.webp\" alt=\"\"><\/p>\n<h3>Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (2)<\/h3>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/%CE%9C%CE%B5%CE%BB%CE%AD%CF%84%CE%B7-%CE%9A%CE%B1%CF%84%CE%B1%CF%83%CE%BA%CE%B5%CF%85%CE%AE-%CE%A6%CE%BF%CF%81%CE%B7%CF%84%CE%AE%CF%82-%CE%A5%CE%B4%CF%81%CE%B1%CF%85%CE%BB%CE%B9%CE%BA%CE%AE%CF%82-%CE%9C%CE%BF%CE%BD%CE%AC%CE%B4%CE%B1%CF%82-%CE%A4%CE%BF%CF%80%CE%BF%CE%B8%CE%AD%CF%84%CE%B7%CF%83%CE%B7%CF%82-%CE%A0%CE%B1%CF%83%CF%83%CE%AC%CE%BB%CF%89%CE%BD-1.webp\" alt=\"\"><\/p>\n<h3>Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (1)<\/h3>\n<\/li>\n<\/ul>\n<h2>Related Projects<\/h2>\n<div>\n<\/div>\n<p><!--more--><br \/>\n<!-- {\"type\":\"layout\",\"children\":[{\"name\":\"Hero\",\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"image_size\":\"cover\",\"style\":\"muted\",\"title_breakpoint\":\"l\",\"title_position\":\"top-right\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-1\"},\"children\":[{\"type\":\"headline\",\"props\":{\"animation\":\"parallax\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"parallax_breakpoint\":\"m\",\"parallax_y_end\":\"-75\",\"parallax_y_start\":\"0\",\"title_decoration\":\"bullet\",\"title_element\":\"h1\",\"title_style\":\"h1\"},\"source\":{\"query\":{\"name\":\"projectss.singleProjects\"},\"props\":{\"content\":{\"name\":\"title\"}}}},{\"type\":\"html\",\"props\":{\"content\":\"Design and construction of a high-performance portable hydraulic unit for pile installation and driving applications. The unit was developed according to the project\u2019s requirements, combining a petrol engine, a high-pressure hydraulic circuit, a control system and a robust wheeled frame to ensure reliable operation under demanding field conditions.\"}}]}]}]},{\"name\":\"Services\",\"type\":\"section\",\"props\":{\"animation_delay\":false,\"image_position\":\"center-center\",\"style\":\"default\",\"title_breakpoint\":\"s\",\"title_position\":\"top-right\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"layout\":\"1-2,1-2\",\"match\":false},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky\":\"section\",\"position_sticky_breakpoint\":\"m\",\"vertical_align\":\"middle\",\"width_medium\":\"1-2\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Project Description\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_color\":\"secondary\",\"title_element\":\"h3\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"This portable hydraulic unit is a fully integrated system, designed and manufactured entirely according to the application requirements for pile installation and driving operations. From engineering the hydraulic circuit and sizing the individual components to fabricating the frame, assembling the unit and conducting the final operational tests, every stage was completed with the aim of ensuring maximum reliability, high performance and safe operation under demanding working conditions.\\n\\nThe unit combines a petrol-powered drive system, a high-pressure hydraulic power unit, a control circuit and a robust wheeled frame in one complete solution designed for maximum performance and reliability.\\n\\nEvery component was designed with the equipment\u2019s overall functionality in mind, from the ergonomic arrangement of its components to easy access for inspection and maintenance. The robust engineering construction and meticulous assembly reflect High Pressure Group\u2019s philosophy of developing specialised hydraulic solutions tailored to the actual requirements of each application.\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}},{\"type\":\"description_list\",\"props\":{\"column_breakpoint\":\"m\",\"layout\":\"grid-2\",\"list_element\":\"ul\",\"list_marker_color\":\"primary\",\"list_size\":\"large\",\"list_style\":\"striped\",\"meta_align\":\"below-content\",\"meta_style\":\"meta\",\"show_content\":true,\"show_link\":true,\"show_meta\":true,\"show_title\":true,\"title_colon\":true,\"title_color\":\"primary\",\"title_element\":\"div\",\"title_grid_column_gap\":\"small\",\"title_grid_row_gap\":\"small\",\"title_grid_width\":\"small\",\"title_style\":\"text-bold\"},\"children\":[{\"type\":\"description_list_item\",\"props\":{\"content\":\"\n\n<p>Greece (EU)<\/p>\n\n\",\"title\":\"Location\"}},{\"type\":\"description_list_item\",\"props\":{\"content\":\"\n\n<p>2026<\/p>\n\n\",\"title\":\"Year\"}},{\"type\":\"description_list_item\",\"props\":{\"content\":\"Engineering & Construction of a Portable Hydraulic Pile-Installation Unit\",\"title\":\"Service\"}}]}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"vertical_align\":\"middle\",\"width_medium\":\"1-2\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/07\/\u039c\u03b5\u03bb\u03ad\u03c4\u03b7-\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae-\u03a6\u03bf\u03c1\u03b7\u03c4\u03ae\u03c2-\u03a5\u03b4\u03c1\u03b1\u03c5\u03bb\u03b9\u03ba\u03ae\u03c2-\u039c\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2-\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2-\u03a0\u03b1\u03c3\u03c3\u03ac\u03bb\u03c9\u03bd-2.webp\",\"image_box_decoration\":\"secondary\",\"image_svg_color\":\"emphasis\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}},{\"type\":\"image\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/07\/\u039c\u03b5\u03bb\u03ad\u03c4\u03b7-\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae-\u03a6\u03bf\u03c1\u03b7\u03c4\u03ae\u03c2-\u03a5\u03b4\u03c1\u03b1\u03c5\u03bb\u03b9\u03ba\u03ae\u03c2-\u039c\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2-\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2-\u03a0\u03b1\u03c3\u03c3\u03ac\u03bb\u03c9\u03bd-1.webp\",\"image_box_decoration\":\"default\",\"image_svg_color\":\"emphasis\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}}]}]}]},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Gallery\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"h1\"}},{\"type\":\"gallery\",\"props\":{\"filter_align\":\"left\",\"filter_all\":true,\"filter_grid_breakpoint\":\"m\",\"filter_grid_width\":\"auto\",\"filter_position\":\"top\",\"filter_style\":\"tab\",\"grid_default\":\"1\",\"grid_masonry\":\"pack\",\"grid_medium\":\"3\",\"image_box_shadow\":\"small\",\"image_hover_box_shadow\":\"large\",\"item_animation\":true,\"lightbox\":true,\"lightbox_bg_close\":true,\"link_style\":\"default\",\"link_text\":\"\",\"link_transition\":\"scale-up\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-meta\",\"overlay_hover\":true,\"overlay_link\":true,\"overlay_mode\":\"cover\",\"overlay_position\":\"center\",\"overlay_style\":\"overlay-primary\",\"overlay_transition\":\"fade\",\"show_content\":true,\"show_hover_image\":true,\"show_hover_video\":true,\"show_link\":true,\"show_meta\":true,\"show_title\":true,\"text_align\":\"center\",\"text_color\":\"light\",\"title_display\":\"lightbox\",\"title_element\":\"h3\",\"title_hover_style\":\"reset\"},\"children\":[{\"type\":\"gallery_item\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/07\/\u039c\u03b5\u03bb\u03ad\u03c4\u03b7-\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae-\u03a6\u03bf\u03c1\u03b7\u03c4\u03ae\u03c2-\u03a5\u03b4\u03c1\u03b1\u03c5\u03bb\u03b9\u03ba\u03ae\u03c2-\u039c\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2-\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2-\u03a0\u03b1\u03c3\u03c3\u03ac\u03bb\u03c9\u03bd-8.webp\",\"title\":\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (8)\"}},{\"type\":\"gallery_item\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/07\/\u039c\u03b5\u03bb\u03ad\u03c4\u03b7-\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae-\u03a6\u03bf\u03c1\u03b7\u03c4\u03ae\u03c2-\u03a5\u03b4\u03c1\u03b1\u03c5\u03bb\u03b9\u03ba\u03ae\u03c2-\u039c\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2-\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2-\u03a0\u03b1\u03c3\u03c3\u03ac\u03bb\u03c9\u03bd-7.webp\",\"title\":\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (7)\"}},{\"type\":\"gallery_item\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/07\/\u039c\u03b5\u03bb\u03ad\u03c4\u03b7-\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae-\u03a6\u03bf\u03c1\u03b7\u03c4\u03ae\u03c2-\u03a5\u03b4\u03c1\u03b1\u03c5\u03bb\u03b9\u03ba\u03ae\u03c2-\u039c\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2-\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2-\u03a0\u03b1\u03c3\u03c3\u03ac\u03bb\u03c9\u03bd-6.webp\",\"title\":\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (6)\"}},{\"type\":\"gallery_item\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/07\/\u039c\u03b5\u03bb\u03ad\u03c4\u03b7-\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae-\u03a6\u03bf\u03c1\u03b7\u03c4\u03ae\u03c2-\u03a5\u03b4\u03c1\u03b1\u03c5\u03bb\u03b9\u03ba\u03ae\u03c2-\u039c\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2-\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2-\u03a0\u03b1\u03c3\u03c3\u03ac\u03bb\u03c9\u03bd-5.webp\",\"title\":\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (5)\"}},{\"type\":\"gallery_item\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/07\/\u039c\u03b5\u03bb\u03ad\u03c4\u03b7-\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae-\u03a6\u03bf\u03c1\u03b7\u03c4\u03ae\u03c2-\u03a5\u03b4\u03c1\u03b1\u03c5\u03bb\u03b9\u03ba\u03ae\u03c2-\u039c\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2-\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2-\u03a0\u03b1\u03c3\u03c3\u03ac\u03bb\u03c9\u03bd-4.webp\",\"title\":\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (4)\"}},{\"type\":\"gallery_item\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/07\/\u039c\u03b5\u03bb\u03ad\u03c4\u03b7-\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae-\u03a6\u03bf\u03c1\u03b7\u03c4\u03ae\u03c2-\u03a5\u03b4\u03c1\u03b1\u03c5\u03bb\u03b9\u03ba\u03ae\u03c2-\u039c\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2-\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2-\u03a0\u03b1\u03c3\u03c3\u03ac\u03bb\u03c9\u03bd-3.webp\",\"title\":\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (3)\"}},{\"type\":\"gallery_item\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/07\/\u039c\u03b5\u03bb\u03ad\u03c4\u03b7-\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae-\u03a6\u03bf\u03c1\u03b7\u03c4\u03ae\u03c2-\u03a5\u03b4\u03c1\u03b1\u03c5\u03bb\u03b9\u03ba\u03ae\u03c2-\u039c\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2-\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2-\u03a0\u03b1\u03c3\u03c3\u03ac\u03bb\u03c9\u03bd-2.webp\",\"title\":\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (2)\"}},{\"type\":\"gallery_item\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/07\/\u039c\u03b5\u03bb\u03ad\u03c4\u03b7-\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae-\u03a6\u03bf\u03c1\u03b7\u03c4\u03ae\u03c2-\u03a5\u03b4\u03c1\u03b1\u03c5\u03bb\u03b9\u03ba\u03ae\u03c2-\u039c\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2-\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2-\u03a0\u03b1\u03c3\u03c3\u03ac\u03bb\u03c9\u03bd-1.webp\",\"title\":\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit (1)\"}}]}]}]}],\"name\":\"gallery\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Related Projects\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\"}},{\"type\":\"grid\",\"props\":{\"animation\":\"scale-up\",\"content_column_breakpoint\":\"m\",\"filter_align\":\"left\",\"filter_all\":true,\"filter_grid_breakpoint\":\"m\",\"filter_grid_width\":\"auto\",\"filter_position\":\"top\",\"filter_style\":\"tab\",\"grid_default\":\"1\",\"grid_masonry\":\"pack\",\"grid_medium\":\"4\",\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_height\":200,\"image_link\":true,\"image_svg_color\":\"emphasis\",\"image_transition\":\"scale-up\",\"image_transition_border\":false,\"image_width\":300,\"item_animation\":true,\"lightbox_bg_close\":true,\"link_style\":\"default\",\"link_text\":\"\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"\",\"panel_image_no_padding\":true,\"panel_link\":true,\"panel_link_hover\":true,\"panel_padding\":\"small\",\"panel_style\":\"card-default\",\"show_content\":true,\"show_hover_image\":true,\"show_hover_video\":true,\"show_image\":true,\"show_link\":true,\"show_meta\":true,\"show_title\":true,\"show_video\":true,\"text_align\":\"center\",\"title_align\":\"top\",\"title_color\":\"secondary\",\"title_element\":\"h3\",\"title_font_family\":\"default\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\",\"title_link\":true,\"title_style\":\"h5\"},\"children\":[{\"type\":\"grid_item\",\"source\":{\"query\":{\"name\":\"projectss.customProjectss\",\"arguments\":{\"terms\":[70],\"categories_operator\":\"IN\",\"post_tag_operator\":\"IN\",\"users\":[],\"users_operator\":\"IN\",\"offset\":0,\"limit\":4,\"order\":\"rand\",\"order_direction\":\"DESC\"}},\"props\":{\"title\":{\"name\":\"title\"},\"link\":{\"name\":\"link\"},\"tags\":{\"arguments\":{\"separator\":\", \",\"show_link\":true,\"link_style\":\"\"},\"name\":\"post_tagString\"},\"image\":{\"arguments\":[],\"name\":\"featuredImage.url\"}}}}],\"name\":\"erga grid\"}]}]}],\"name\":\"related\"}],\"version\":\"5.0.29\"} --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Design and construction of a high-performance portable hydraulic unit for pile installation and driving applications. The unit was developed according to the project\u2019s requirements, combining a petrol engine, a high-pressure hydraulic circuit, a control system and a robust wheeled frame to ensure reliable operation under demanding field conditions. Project Description This portable hydraulic unit is [&hellip;]<\/p>\n","protected":false},"featured_media":3433,"template":"","meta":{"_acf_changed":false,"footnotes":""},"tags":[],"project_category":[81],"class_list":["post-3431","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_category-kataskeues"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Design and construction of a high-performance portable hydraulic unit for pile installation and driving applications. The unit was developed according to the project\u2019s requirements, combining a petrol engine, a high-pressure hydraulic circuit, a control system and a robust wheeled frame to ensure reliable operation under demanding field conditions. Project Description This portable hydraulic unit is\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"High Pressure Group |\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit | High Pressure Group\" \/>\n\t\t<meta property=\"og:description\" content=\"Design and construction of a high-performance portable hydraulic unit for pile installation and driving applications. The unit was developed according to the project\u2019s requirements, combining a petrol engine, a high-pressure hydraulic circuit, a control system and a robust wheeled frame to ensure reliable operation under demanding field conditions. Project Description This portable hydraulic unit is\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-07-31T15:01:31+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-08-07T12:56:10+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit | High Pressure Group\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Design and construction of a high-performance portable hydraulic unit for pile installation and driving applications. The unit was developed according to the project\u2019s requirements, combining a petrol engine, a high-pressure hydraulic circuit, a control system and a robust wheeled frame to ensure reliable operation under demanding field conditions. Project Description This portable hydraulic unit is\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/projects\\\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/project_category\\\/kataskeues\\\/#listItem\",\"name\":\"Constructions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/project_category\\\/kataskeues\\\/#listItem\",\"position\":2,\"name\":\"Constructions\",\"item\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/project_category\\\/kataskeues\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/projects\\\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\\\/#listItem\",\"name\":\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/projects\\\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\\\/#listItem\",\"position\":3,\"name\":\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/project_category\\\/kataskeues\\\/#listItem\",\"name\":\"Constructions\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/#organization\",\"name\":\"High Pressure Group\",\"url\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/projects\\\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\\\/#webpage\",\"url\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/projects\\\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\\\/\",\"name\":\"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit | High Pressure Group\",\"description\":\"Design and construction of a high-performance portable hydraulic unit for pile installation and driving applications. The unit was developed according to the project\\u2019s requirements, combining a petrol engine, a high-pressure hydraulic circuit, a control system and a robust wheeled frame to ensure reliable operation under demanding field conditions. Project Description This portable hydraulic unit is\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/projects\\\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\\\/#breadcrumblist\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/highpressuregroup.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/\\u039c\\u03b5\\u03bb\\u03ad\\u03c4\\u03b7-\\u039a\\u03b1\\u03c4\\u03b1\\u03c3\\u03ba\\u03b5\\u03c5\\u03ae-\\u03a6\\u03bf\\u03c1\\u03b7\\u03c4\\u03ae\\u03c2-\\u03a5\\u03b4\\u03c1\\u03b1\\u03c5\\u03bb\\u03b9\\u03ba\\u03ae\\u03c2-\\u039c\\u03bf\\u03bd\\u03ac\\u03b4\\u03b1\\u03c2-\\u03a4\\u03bf\\u03c0\\u03bf\\u03b8\\u03ad\\u03c4\\u03b7\\u03c3\\u03b7\\u03c2-\\u03a0\\u03b1\\u03c3\\u03c3\\u03ac\\u03bb\\u03c9\\u03bd-2.webp\",\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/projects\\\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\\\/#mainImage\",\"width\":1448,\"height\":1086},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/projects\\\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\\\/#mainImage\"},\"datePublished\":\"2026-07-31T18:01:31+03:00\",\"dateModified\":\"2026-08-07T15:56:10+03:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/\",\"name\":\"High Pressure Group\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/highpressuregroup.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit | High Pressure Group","description":"Design and construction of a high-performance portable hydraulic unit for pile installation and driving applications. The unit was developed according to the project\u2019s requirements, combining a petrol engine, a high-pressure hydraulic circuit, a control system and a robust wheeled frame to ensure reliable operation under demanding field conditions. Project Description This portable hydraulic unit is","canonical_url":"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/highpressuregroup.com\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/highpressuregroup.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/highpressuregroup.com\/en\/project_category\/kataskeues\/#listItem","name":"Constructions"}},{"@type":"ListItem","@id":"https:\/\/highpressuregroup.com\/en\/project_category\/kataskeues\/#listItem","position":2,"name":"Constructions","item":"https:\/\/highpressuregroup.com\/en\/project_category\/kataskeues\/","nextItem":{"@type":"ListItem","@id":"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/#listItem","name":"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit"},"previousItem":{"@type":"ListItem","@id":"https:\/\/highpressuregroup.com\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/#listItem","position":3,"name":"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit","previousItem":{"@type":"ListItem","@id":"https:\/\/highpressuregroup.com\/en\/project_category\/kataskeues\/#listItem","name":"Constructions"}}]},{"@type":"Organization","@id":"https:\/\/highpressuregroup.com\/en\/#organization","name":"High Pressure Group","url":"https:\/\/highpressuregroup.com\/en\/"},{"@type":"WebPage","@id":"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/#webpage","url":"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/","name":"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit | High Pressure Group","description":"Design and construction of a high-performance portable hydraulic unit for pile installation and driving applications. The unit was developed according to the project\u2019s requirements, combining a petrol engine, a high-pressure hydraulic circuit, a control system and a robust wheeled frame to ensure reliable operation under demanding field conditions. Project Description This portable hydraulic unit is","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/highpressuregroup.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/#breadcrumblist"},"image":{"@type":"ImageObject","url":"https:\/\/highpressuregroup.com\/wp-content\/uploads\/2026\/07\/\u039c\u03b5\u03bb\u03ad\u03c4\u03b7-\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae-\u03a6\u03bf\u03c1\u03b7\u03c4\u03ae\u03c2-\u03a5\u03b4\u03c1\u03b1\u03c5\u03bb\u03b9\u03ba\u03ae\u03c2-\u039c\u03bf\u03bd\u03ac\u03b4\u03b1\u03c2-\u03a4\u03bf\u03c0\u03bf\u03b8\u03ad\u03c4\u03b7\u03c3\u03b7\u03c2-\u03a0\u03b1\u03c3\u03c3\u03ac\u03bb\u03c9\u03bd-2.webp","@id":"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/#mainImage","width":1448,"height":1086},"primaryImageOfPage":{"@id":"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/#mainImage"},"datePublished":"2026-07-31T18:01:31+03:00","dateModified":"2026-08-07T15:56:10+03:00"},{"@type":"WebSite","@id":"https:\/\/highpressuregroup.com\/en\/#website","url":"https:\/\/highpressuregroup.com\/en\/","name":"High Pressure Group","inLanguage":"en-US","publisher":{"@id":"https:\/\/highpressuregroup.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"High Pressure Group |","og:type":"article","og:title":"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit | High Pressure Group","og:description":"Design and construction of a high-performance portable hydraulic unit for pile installation and driving applications. The unit was developed according to the project\u2019s requirements, combining a petrol engine, a high-pressure hydraulic circuit, a control system and a robust wheeled frame to ensure reliable operation under demanding field conditions. Project Description This portable hydraulic unit is","og:url":"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/","article:published_time":"2026-07-31T15:01:31+00:00","article:modified_time":"2026-08-07T12:56:10+00:00","twitter:card":"summary_large_image","twitter:title":"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit | High Pressure Group","twitter:description":"Design and construction of a high-performance portable hydraulic unit for pile installation and driving applications. The unit was developed according to the project\u2019s requirements, combining a petrol engine, a high-pressure hydraulic circuit, a control system and a robust wheeled frame to ensure reliable operation under demanding field conditions. Project Description This portable hydraulic unit is"},"aioseo_meta_data":{"post_id":"3431","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"WebPage","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-08-07 10:18:22","updated":"2026-08-07 13:14:21","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/highpressuregroup.com\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/highpressuregroup.com\/en\/project_category\/kataskeues\/\" title=\"Constructions\">Constructions<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tEngineering and Construction of a Portable Hydraulic Pile-Installation Unit\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/highpressuregroup.com\/en\/"},{"label":"Constructions","link":"https:\/\/highpressuregroup.com\/en\/project_category\/kataskeues\/"},{"label":"Engineering and Construction of a Portable Hydraulic Pile-Installation Unit","link":"https:\/\/highpressuregroup.com\/en\/projects\/meleti-kataskevi-foritis-ydravlikis-monadas-topothetisis-passalon\/"}],"_links":{"self":[{"href":"https:\/\/highpressuregroup.com\/en\/wp-json\/wp\/v2\/projects\/3431","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/highpressuregroup.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/highpressuregroup.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":8,"href":"https:\/\/highpressuregroup.com\/en\/wp-json\/wp\/v2\/projects\/3431\/revisions"}],"predecessor-version":[{"id":3683,"href":"https:\/\/highpressuregroup.com\/en\/wp-json\/wp\/v2\/projects\/3431\/revisions\/3683"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/highpressuregroup.com\/en\/wp-json\/wp\/v2\/media\/3433"}],"wp:attachment":[{"href":"https:\/\/highpressuregroup.com\/en\/wp-json\/wp\/v2\/media?parent=3431"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/highpressuregroup.com\/en\/wp-json\/wp\/v2\/tags?post=3431"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/highpressuregroup.com\/en\/wp-json\/wp\/v2\/project_category?post=3431"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}